Highlights of 2012-2013

  • EMAAR DCP 3- Project
  • Le Meridian DCP Project
  • LPG Pump Interface System for Qatar Petroleum.
  • TP05- PLC Based Marshalling System for Fire and Safety Collage Project.
  • C&I Design and Engineering services for ONGC Sagar Samrat Conversion Project.
  • Car Park ventilation system to NGM Doha.
  • BTU Metering and AMR system for Barwa Commercial Avenue Doha.
  • ETS Control system and Its Integration with DCP for The Wave Muscat,
  • Fire Hydrant Control system for Perl Jumeirah Dubai.
  • Emirates Hanger DCP Control System.
  • CCTV System and Its Integration for Qatar Pearl ETS .
  • SCADA system for Dubai Sports City DCP.
  • Control system for Air Cooled Chiller Plant at Lusail Development.
  • Control system for Thermal Storage Tank project at DIP1- DCP.
  • PLC Control System for Chiller skid packages for Empower.
  • EMAAR DCP-1, DCP-2 and 44 ETS Building Upgrade Projects